Advances in conventional excavations
Wednesday, September 8, 2021
AFTES21, Communication orale
C - Innovation in building underground structures
•
C8-2
•
2:00 PM
>
3:30 PM
•
Advances in conventional excavations
•
Salle Neuilly
C - Innovation in building underground structures
2:00 PM
•
INT18
•
Introduction
2:10 PM
•
228
•
CERN HL-LHC POINT 1, The ‘flexible’ US/UW17 cavern temporary lining, an innovative solution
>
J.
Jérémy
VOIRON (Lausanne)
2:30 PM
•
324
•
Grand Paris Express - Line 15 - part T2C: Excavating an underground structure following the conventional method in an urban area: specific phasing civil work and reinforced monitoring
>
E.
Erwan
MOAL (Paris)
2:50 PM
•
268
•
From a jetting solution to a umbrella vault to minimize the settlements of the connection tunnel of line 11 between Marie des Lilas and the New Serge Gainsbourg station
>
C.
Cecile
GERARDIN (Fontenay-Sous-Bois)
3:10 PM
•
246
•
Design, construction and monitoring follow-up of two dividing structures on MTR line E under La Defense business district
>
S.
Samuel
REYNAUD (Paris)
|