AFTES 2021 6th - 8th September 2021 Palais des Congrès

Advances in conventional excavations

Wednesday, September 8, 2021
AFTES21, Communication orale
C - Innovation in building underground structures C8-2 2:00 PM > 3:30 PM Advances in conventional excavations Salle Neuilly C - Innovation in building underground structures

2:00 PM INT18 Introduction 2:10 PM 228 CERN HL-LHC POINT 1, The ‘flexible’ US/UW17 cavern temporary lining, an innovative solution > J. Jérémy VOIRON (Lausanne) 2:30 PM 324 Grand Paris Express - Line 15 - part T2C: Excavating an underground structure following the conventional method in an urban area: specific phasing civil work and reinforced monitoring > E. Erwan MOAL (Paris) 2:50 PM 268 From a jetting solution to a umbrella vault to minimize the settlements of the connection tunnel of line 11 between Marie des Lilas and the New Serge Gainsbourg station > C. Cecile GERARDIN (Fontenay-Sous-Bois) 3:10 PM 246 Design, construction and monitoring follow-up of two dividing structures on MTR line E under La Defense business district > S. Samuel REYNAUD (Paris)

Site créé par Live! by GL events et hébergé par key4events.com
Politique de confidentialité de Live! by GL events

 

Copyright © key4events - All rights reserved