AFTES 2021 6th - 8th September 2021 Palais des Congrès

Logistical constraints and innovative solutions

Tuesday, September 7, 2021
AFTES21, Communication orale
C - Innovation in building underground structures C5 2:00 PM > 3:30 PM Logistical constraints and innovative solutions Salle Paris C - Innovation in building underground structures

2:00 PM INT11 Introduction 2:10 PM 323 Temporary Ventilation and Cooling of Tunnels – Risk Management by Numerical Simulation > B. Benoît BÉGUIN (Bern) 2:30 PM 339 Start of a TBM in an urban site constrained by a small footprint and close to a tram line (Grand Paris Line 15) > G. Georges PIRES (Saint Quentin En Yvelines) 2:50 PM 364 Logistical constraints on huge underground works: excavated material in the construction site 05 of the Lyon - Turin Base tunnel > F. François REDOUTEY (Aix-Les-Bains) 3:10 PM 357 TBM launching shaft of the Ile de Monsieur, section T3A of line 15 south of Grand Paris Express: design, execution and retro-analysis > M. Martin CAHN (Paris)

Site créé par Live! by GL events et hébergé par key4events.com
Politique de confidentialité de Live! by GL events

 

Copyright © key4events - All rights reserved