Logistical constraints and innovative solutions
Tuesday, September 7, 2021
AFTES21, Communication orale
C - Innovation in building underground structures
•
C5
•
2:00 PM
>
3:30 PM
•
Logistical constraints and innovative solutions
•
Salle Paris
C - Innovation in building underground structures
2:00 PM
•
INT11
•
Introduction
2:10 PM
•
323
•
Temporary Ventilation and Cooling of Tunnels – Risk Management by Numerical Simulation
>
B.
Benoît
BÉGUIN (Bern)
2:30 PM
•
339
•
Start of a TBM in an urban site constrained by a small footprint and close to a tram line (Grand Paris Line 15)
>
G.
Georges
PIRES (Saint Quentin En Yvelines)
2:50 PM
•
364
•
Logistical constraints on huge underground works: excavated material in the construction site 05 of the Lyon - Turin Base tunnel
>
F.
François
REDOUTEY (Aix-Les-Bains)
3:10 PM
•
357
•
TBM launching shaft of the Ile de Monsieur, section T3A of line 15 south of Grand Paris Express: design, execution and retro-analysis
>
M.
Martin
CAHN (Paris)
|